{"id":2785,"date":"2025-12-01T17:03:24","date_gmt":"2025-12-01T16:03:24","guid":{"rendered":"https:\/\/www.ardent-invest.be\/dream-energy-ardent-inaugure-sa-premiere-station-de-recharge-rapide-en-province-de-liege\/"},"modified":"2025-12-01T17:31:57","modified_gmt":"2025-12-01T16:31:57","slug":"dream-energy-ardent-inaugure-sa-premiere-station-de-recharge-rapide-en-province-de-liege","status":"publish","type":"post","link":"https:\/\/www.ardent-invest.be\/en\/dream-energy-ardent-inaugure-sa-premiere-station-de-recharge-rapide-en-province-de-liege\/","title":{"rendered":"Dream Energy Ardent inaugurates its first fast charging station in the Province of Li\u00e8ge"},"content":{"rendered":"<p><strong>Dream Energy Ardent continues to expand its network of fast charging stations with the inauguration of a new station at the Neupr\u00e9 commercial site on Friday, November 28, in the presence of Virginie Defrang-Firket, Mayor of the city. This is the first Dream Energy station in the Province of Li\u00e8ge, marking a new stage in the strategy to roll out more efficient and accessible electric mobility in Wallonia.<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-2775\" src=\"https:\/\/www.ardent-invest.be\/wp-content\/uploads\/2025\/12\/imgl5915-600x400.jpg\" alt=\"Imgl5915\" width=\"600\" height=\"400\" srcset=\"https:\/\/www.ardent-invest.be\/wp-content\/uploads\/2025\/12\/imgl5915-600x400.jpg 600w, https:\/\/www.ardent-invest.be\/wp-content\/uploads\/2025\/12\/imgl5915-1024x683.jpg 1024w, https:\/\/www.ardent-invest.be\/wp-content\/uploads\/2025\/12\/imgl5915-768x512.jpg 768w, https:\/\/www.ardent-invest.be\/wp-content\/uploads\/2025\/12\/imgl5915-1536x1025.jpg 1536w, https:\/\/www.ardent-invest.be\/wp-content\/uploads\/2025\/12\/imgl5915-2048x1366.jpg 2048w, https:\/\/www.ardent-invest.be\/wp-content\/uploads\/2025\/12\/imgl5915-scaled.jpg 1619w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>Located at Route du Condroz 107, this new station has four ultra-fast charging points capable of delivering up to 150 kW, adding 100 km of range in less than 10 minutes. Accessible 24\/7, it is located in an area with several popular stores, offering motorists convenient and fast charging while they shop or go about their daily commute.<br \/>\nAs with all stations in the network, Dream Energy supplies 100% renewable electricity from the hydroelectric and photovoltaic facilities it operates.<br \/>\nThanks to its integrated model, combining green energy production, charging station management, and location on land controlled in collaboration with Ardent Invest, Dream Energy Ardent guarantees attractive charging prices, stable rates, and optimal availability of its infrastructure.<\/p>\n<p>As with all stations in the network, Dream Energy supplies 100% renewable electricity from the hydroelectric and photovoltaic facilities it operates.<br \/>\nThanks to its integrated model, combining green energy production, charging station management, and location on land controlled in collaboration with Ardent Invest, Dream Energy Ardent guarantees attractive charging prices, stable rates, and optimal availability of its infrastructure.<\/p>\n<p>&#8220;With this new station in Neupr\u00e9, we are pursuing our ambition to offer electric vehicle drivers fast, reliable charging powered by 100% renewable electricity produced in France. Thanks to our integrated model, we guarantee competitive energy and a consistent charging experience throughout our network. Our goal is clear: to facilitate simpler, more accessible, and more sustainable electric mobility for all,&#8221; says Philippe Baudry, CEO of Dream Energy.<\/p>\n<p>&#8220;Within our Real Estate division, our ambition is to develop increasingly attractive real estate sites that are in line with the uses and expectations of their occupants. The integration of high-performance charging stations is fully in line with this approach, while contributing to the energy transition\u2014a mission led by our Energy division. This development in Neupr\u00e9 perfectly illustrates the complementarity between our activities and the synergy we are implementing to create value for users,&#8221; adds Nicolas L\u00e9onard, CEO of Ardent Invest.<\/p>\n<p>This station in Neupr\u00e9 is the second to be commissioned by Dream Energy Ardent in Belgium, following the one in Wellin, which opened in May 2025. It is part of a rollout program that will see a dozen new stations installed in the coming months at various Ardent Invest commercial sites and on land owned by WEB, with whom a strategic agreement was signed in 2024.<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-2781\" src=\"https:\/\/www.ardent-invest.be\/wp-content\/uploads\/2025\/12\/carte_implantantation_premieres_stations_dream-energy_web-600x600.png\" alt=\"Carte Implantantation Premieres Stations Dream Energy Web\" width=\"600\" height=\"600\" srcset=\"https:\/\/www.ardent-invest.be\/wp-content\/uploads\/2025\/12\/carte_implantantation_premieres_stations_dream-energy_web-600x600.png 600w, https:\/\/www.ardent-invest.be\/wp-content\/uploads\/2025\/12\/carte_implantantation_premieres_stations_dream-energy_web-150x150.png 150w, https:\/\/www.ardent-invest.be\/wp-content\/uploads\/2025\/12\/carte_implantantation_premieres_stations_dream-energy_web.png 680w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>The goal is to offer a fast, reliable, and consistent charging experience in everyday locations such as shops, service centers, and transit areas.<\/p>\n<p><strong>Station address:<\/strong><br \/>\nArdent Real Estate commercial site parking lot \u2013 Route du Condroz 107, 4120 Neupr\u00e9, Belgium.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dream Energy Ardent continues to expand its network of fast charging stations with the inauguration of a new station at [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":2774,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[17],"class_list":["post-2785","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-update-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.ardent-invest.be\/en\/wp-json\/wp\/v2\/posts\/2785","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ardent-invest.be\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ardent-invest.be\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ardent-invest.be\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ardent-invest.be\/en\/wp-json\/wp\/v2\/comments?post=2785"}],"version-history":[{"count":2,"href":"https:\/\/www.ardent-invest.be\/en\/wp-json\/wp\/v2\/posts\/2785\/revisions"}],"predecessor-version":[{"id":2787,"href":"https:\/\/www.ardent-invest.be\/en\/wp-json\/wp\/v2\/posts\/2785\/revisions\/2787"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ardent-invest.be\/en\/wp-json\/wp\/v2\/media\/2774"}],"wp:attachment":[{"href":"https:\/\/www.ardent-invest.be\/en\/wp-json\/wp\/v2\/media?parent=2785"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ardent-invest.be\/en\/wp-json\/wp\/v2\/categories?post=2785"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}